Confirm the proposed assembly
Ask PMA to review the proposed construction against the recorded duty. Check the tube schedule, heater arrangement, sensing, terminations and supplied accessories together. Keep the manufacturer’s family options separate from the exact assembly offered.
The manufacturer line card includes dedicated CEMS constructions and options. It is a range overview, rather than confirmation that every option or approval applies to a particular enquiry.
Keep the acceptance basis visible
Record the drawing revision, agreed requirements, outstanding questions and planned checks before service. Define the acceptance criteria with the system designer and the site’s authorised procedures.
A tubing quotation does not by itself validate the complete emissions measurement system. Keep the review of transport conditions and system performance with the responsible project team.