Suspended solids & SVI analysis.Discover S3A

Chlorine residual at treatment works

Give a treated-water residual a defined monitoring point, reference method and operating response.

Define what the reading represents

Choose a named treated-water point before choosing the mounting arrangement. A blended outlet, a single treatment stream and a sample line after storage answer different questions. Document the active flow route and the timing between the process and the sensor.

Agree the monitoring objective, water conditions and operating response with your site team. PMA can help assess the sensor, mounting and interfaces as one arrangement.

PMA colleagues reviewing an MP5 blue sensor at a desk

A practical planning sequence

Locate the measurement

Map the normal and alternative water routes. Record the sampling point, sample transit time and changes caused by standby streams or bypasses.

Choose the residual

Use MP5 for a suitable free-chlorine duty. Where monochloramine and free chlorine matter, review MP6 and its operating mode. Check pH, temperature and conductivity against the selected model.

Commission the reference

Compare against the corresponding reference method at the same location and time. Record method, result, sensor mode, calibration and the uncertainty relevant to the comparison.

Define the response

Agree who receives an alarm, what reference check follows and how maintenance, sample interruption or poor signal quality are marked in the trend.

Keep an operational record

Store the residual trend alongside the configured channel, point identity, reference checks and process state. A self-cleaning sensor reduces routine cleaning but does not explain a residual change by itself. Link dose changes, water blends and maintenance to the recorded event, and retain unresolved differences for the next shift.

Self-cleaning with planned checks

The impeller and cleaning beads act at the sensing surfaces while the sensor operates. Include reference checks, inspection, bead and wear-part care in the site maintenance plan. Both supplied sensor guides describe typical six-month calibration stability and require calibration checks at least every six months.

Build your monitoring solution

Looking after your world since 1971

PMA connects the measurement, installation and operating team. We help you review the application, select suitable instrumentation and plan commissioning, training and ongoing service.

Talk to the PMA team

Let’s talk about your application.

Speak to the PMA team about your instruments, reagents or service requirements. Tell us what you need, and we’ll help you find the right next step.

  • Advice for your application. Find the right instruments, sensors and chemical reagents for your process.
  • Practical service support. Discuss commissioning, calibration, maintenance or an instrument issue with our team.
  • Clear next steps. Ask a technical question or request a callback, with your site and measurements in mind.
  • An enquiry, not a mailing list. Your details are used to respond to you. You won’t be added to a marketing database.

Trusted by our clients

Prefer to speak with us?

Call 01484 843 708

You can also email [email protected].

Tell us how we can help

Share your requirements below. All fields are required.


Your enquiry goes directly to our team. Your details are used to respond to you, and you won’t be added to a marketing database. Read our privacy policy.