Suspended solids & SVI analysis.Discover S3A

Reservoir residuals

Relate a chlorine residual to the storage location, water movement and the period it represents.

An inlet and an outlet answer different questions

Define whether you need the incoming residual, the water leaving storage or the conditions at an immersed location. One point does not describe every part of a reservoir. Review water routes and operating changes before treating a trend as a whole-storage condition.

Agree the monitoring objective, water conditions and operating response with your site team. PMA can help assess the sensor, mounting and interfaces as one arrangement.

PMA colleagues reviewing an MP5 blue sensor at a desk

A practical planning sequence

Name the location

Identify inlet, outlet or immersion point. Record draw-off arrangement and changing operating levels, with the representative water question kept explicit.

Review the mounting

Consider a side-stream flow cell, a suitable in-pipe variant or an immersion arrangement. Include isolation, access, pressure and cable routing; keep the sensing end in representative water.

Understand low flow

The powered impeller creates local motion at the sensor. It does not refresh a stagnant sample line or make an unrepresentative location describe the reservoir.

Link records to operation

Record filling, draw-off, inlet changes and sample interruptions alongside the residual. Match collected reference checks to the same point and time.

Make changing storage conditions visible

Use D20 records or a reviewed site connection to keep point identity, residual channel and timestamps together. During an investigation, compare like-for-like periods and retain reference results separately. Agree power and data arrangements for unmanned points before assuming remote access is available.

Self-cleaning with planned checks

The impeller and cleaning beads act at the sensing surfaces while the sensor operates. Include reference checks, inspection, bead and wear-part care in the site maintenance plan. Both supplied sensor guides describe typical six-month calibration stability and require calibration checks at least every six months.

Build your monitoring solution

Looking after your world since 1971

PMA connects the measurement, installation and operating team. We help you review the application, select suitable instrumentation and plan commissioning, training and ongoing service.

Talk to the PMA team

Let’s talk about your application.

Speak to the PMA team about your instruments, reagents or service requirements. Tell us what you need, and we’ll help you find the right next step.

  • Advice for your application. Find the right instruments, sensors and chemical reagents for your process.
  • Practical service support. Discuss commissioning, calibration, maintenance or an instrument issue with our team.
  • Clear next steps. Ask a technical question or request a callback, with your site and measurements in mind.
  • An enquiry, not a mailing list. Your details are used to respond to you. You won’t be added to a marketing database.

Trusted by our clients

Prefer to speak with us?

Call 01484 843 708

You can also email [email protected].

Tell us how we can help

Share your requirements below. All fields are required.


Your enquiry goes directly to our team. Your details are used to respond to you, and you won’t be added to a marketing database. Read our privacy policy.