Stream identity and process position
Record the exact stream name, line tag and neighbouring process stages. Mark the sensor and sample points on the drawing, including any dilution, mixing or separation between them.
Keep green liquor, white liquor, weak black liquor and lime mud individually identified where they form part of the project. Record the material actually present during commissioning.
Output meaning and reference basis
Name each required output and its units: slurry density, dissolved solids, suspended solids or another confirmed result. State which reference method determines each quantity.
Where a result is reported as a chemical concentration or equivalent, document the calibration basis. Do not treat a density reading, a total-solids result and a specific chemical analysis as interchangeable.
Installed model and configuration
Record the actual model, sensor or fitting arrangement, calibration identifier and output scaling. Include the approved operating ranges and the relevant materials and access requirements.
Link the configuration to the selected stream and retain the as-installed drawing. The broad product-family description should not substitute for the specific instrument documentation.
Evidence accepted at handover
Attach representative reference comparisons with timestamps, operating conditions and the active configuration. State the tested range and any relevant conditions that have not yet been covered.
Record scaling, deposits, abrasion or maintenance observations where relevant to the selected point. Keep unresolved measurement issues visible rather than closing them through a paperwork label.