Suspended solids & SVI analysis.Discover S3A
PMA technician operating a 3S colourimeter beside water-treatment tanks

Follow an ammonia change

Link ammonium results to the treatment route, operating state and follow-up evidence.

Give the result a treatment context

An outlet ammonia change becomes more useful when the team can relate it to the plant operating at that time. Name the monitored treatment stream, establish which lanes or units feed it and record any bypass or alternative route. Use the online record to organise a nitrification investigation alongside the works’ existing process observations and reference samples.

The 3S colourimeter provides repeated batch measurements using an ammonium colour-development method. Select the configuration for the sample and expected range. Agree how the result is reported, including whether the units are expressed as nitrogen or ammonium. Establish sample transport and batch-analysis timing so the operating team knows which period each result represents.

PMA team beside a 3S colourimeter and its reagent tray

Keep the plant and analyser record together

Keep the measurement and its operating context together so another shift can review the same record.

Identify the operating units

Record which treatment lanes or units contribute to the sample point. Mark plant changes, return streams and any temporary routing on the trend. A common outlet describes the combined stream and cannot locate a particular contributing lane by itself.

Retain the operating context

Keep the available flow, temperature, aeration and dissolved-oxygen records with the ammonia trend. Include relevant plant events and the site’s established biological-treatment observations. The purpose is to preserve evidence for a review, rather than infer a single cause from an ammonia result alone.

Record measurement timing

Distinguish the take-off time, travel through the sample line and analysis/reporting time. Record the configured analysis interval and any stream switching. Preserve gaps as gaps. An interpolation should be identified rather than presented as a measured value.

Make maintenance events traceable

Keep calibration, check-solution, reagent, cleaning and sample-flow events with the valid process results. When a sample line has been interrupted, establish when representative water reached the analyser again before treating the next reading as a fresh plant result.

Build the investigation around a dated change

Use the trend to organise follow-up checks under the works’ established operating procedures.

Compare the event with the flow route

Look for coincident changes in the water arriving at the point. Identify whether the reading reflects a treatment change, a different contributing stream or a period of interrupted sample delivery. Record the evidence and the operator responsible for the next step.

Use the other plant measurements

Review the ammonia event with relevant operating records under the works’ procedures. The 3S ammonia channel does not itself measure dissolved oxygen or demonstrate the cause of a biological upset. Keep observations and decisions attributable to their own instruments and sampling points.

Verify against the agreed reference

Collect the reference sample from the defined point and record its time, handling and method. Match the reporting basis before comparing values. Account for the online measurement interval and sample transport when deciding which reading corresponds to the collected sample.

Preserve the response and outcome

Keep the original series, reference sample IDs, operator response and next review time together. Record any change to sampling or calibration during the investigation. A later improvement in the reading should be reviewed against the updated operating state and supporting evidence.

Bring PMA a wastewater-monitoring brief

Send the treatment layout and sample point, expected and peak concentrations, reporting basis and current reference method. Include solids, temperature, sample-line distance, available flow, required update interval and the operating decision. PMA can review the 3S configuration, sample delivery, reagent plan and plant signals for the proposed duty.

Manufacturer method information

Looking after
your world since 1971

PMA connects the measurement, installation and operating team. We help you review the application, select suitable instrumentation and plan commissioning, training and ongoing service.

Discuss your application

Let’s talk about your application.

Speak to the PMA team about your instruments, reagents or service requirements. Tell us what you need, and we’ll help you find the right next step.

  • Advice for your application. Find the right instruments, sensors and chemical reagents for your process.
  • Practical service support. Discuss commissioning, calibration, maintenance or an instrument issue with our team.
  • Clear next steps. Ask a technical question or request a callback, with your site and measurements in mind.
  • An enquiry, not a mailing list. Your details are used to respond to you. You won’t be added to a marketing database.

Trusted by our clients

Prefer to speak with us?

Call 01484 843 708

You can also email [email protected].

Tell us how we can help

Share your requirements below. All fields are required.


Your enquiry goes directly to our team. Your details are used to respond to you, and you won’t be added to a marketing database. Read our privacy policy.