Suspended solids & SVI analysis.Discover S3A

Dekoron Unitherm heat traced tubing

Specify electrically traced, steam traced and pre-insulated tubing for freeze protection, temperature maintenance and reliable sample transport.

Protect the journey from process to instrument

A small-bore line can be a critical part of your process. Freezing can interrupt flow, cooling can change fluid viscosity, and condensation can affect an analyser sample before it reaches the instrument.

Dekoron Unitherm tubing bundles combine the process tube, the specified heating arrangement, thermal insulation and a protective outer jacket in a factory-built assembly. PMA supplies the range and helps you review the conditions that determine the right construction.

Start with what the line must do: prevent freezing, maintain a defined temperature, carry steam or condensate, or transport an analytical sample. Then match the tubing, tracing and installation details to that duty.

Illustrative pre-insulated, electric-traced and steam-traced tubing samples

Three tubing options, three different duties

Heat tracing adds energy to the line. Pre-insulation reduces heat loss. Choose the combination around the fluid, the available utilities and the temperature you need to maintain.

Illustrative electric-traced tubing with insulation and protective outer jacket

Electrically traced tubing

An electric heater runs alongside the process tube within the insulated bundle. Use it for freeze protection or temperature maintenance where an electrical supply suits the installation.

Heater options include self-regulating and higher-temperature designs. Specify the required duty before selecting the heater and control arrangement.

Specify electric tracing

Illustrative steam-traced tubing bundle showing process and tracer tubes

Steam traced tubing

A steam tracer transfers heat to the process tube. It is an option for temperature or viscosity maintenance where a suitable steam supply and condensate return are available.

The cabled construction keeps the tubes together for consistent heat transfer and allows bends in different planes.

Specify steam tracing

Illustrative pre-insulated copper tubing sample

Pre-insulated tubing

Insulated transport tubing carries steam, gas or liquid without an integral electric heater. Series 2200 is used for steam distribution and condensate return, including refinery and petrochemical duties.

A continuous outer jacket protects the insulation. Insulation alone cannot guarantee freeze protection during a prolonged shutdown.

Specify pre-insulation

Explore the manufacturer’s electric traced, steam traced and pre-insulated tubing information.

Built around the duty of your line

Specify the complete bundle together so the tubing, heater, insulation and jacket work as a system.

Consistent construction

A defined construction provides repeatable insulation and component positioning along the line. It reduces the amount of tracing and insulation work that must be assembled on site.

Insulation choices

The electric-traced range includes fibrous-glass and aerogel insulation options. Marmon describes aerogel designs as offering improved thermal efficiency and smaller outside diameters.

Routing and protection

Cabled tubing constructions bend in multiple planes without twisting the bundle to make the bend. Select the jacket and installation arrangement for the environment and the required mechanical protection.

Technical details that guide the specification

The following are published family options, rather than a single specification shared by every bundle. PMA will confirm the exact construction and ratings for your enquiry.

Tube sizes and materials

The electric-traced line card lists ¼, ⅜, ½ and ¾ inch sizes, plus 6, 10 and 12 mm. Common materials include 316/316L stainless steel, copper and PFA; availability depends on the product family.

Specify outside diameter, wall thickness, fluid compatibility and pressure requirements together.

Heater temperatures

Published maximum operating temperatures are 85°C for low-temperature self-regulating, 150°C for high-temperature self-regulating and 204°C for power-limiting designs.

These are family ratings, not guaranteed maintained temperatures for every ambient condition or line length.

Bundle configuration

Self-regulating electric bundles are listed with 1–4 tubes, subject to tube diameter and material. Options include replaceable-heater carrier-tube designs and multiple heating zones.

Tell us which tubes need heating and which auxiliary lines or connections are required.

Process exposure

A hot process or steam blowdown can expose a heater to conditions above its operating limit. Specialist buffered constructions separate the heater from the hot tube.

State normal, maximum and cleaning temperatures separately. A high exposure-temperature design is not a standard heater’s maintenance-temperature rating.

Technical basis: Dekoron Unitherm manufacturer line card and buffer-design application case study. Share the area classification and required certification with PMA so suitability can be checked for the supplied assembly.

Applications across process industries

The same tubing family can serve very different processes. Use these application starting points to describe your duty, then ask PMA to review the construction for your site.

Refining, oil and gas

Review instrument impulse lines, small-bore process lines and temperature-sensitive sample transport. Include steam supply and condensate return duties when planning the complete tracing system.

Explore application

Chemical processes

Match wetted materials to the fluid and maintain the temperature needed for transport. Include start-up, shutdown and cleaning conditions in the specification.

Explore application

Power generation

Plan steam sampling and instrument lines around both normal operation and hot-process exposure. Combined-cycle applications may need a buffered heater construction.

Emissions monitoring

Heated CEMS sample lines help manage condensation between the sampling point and analyser. Define the gas composition, sample temperature, materials, line length and any calibration or blowback lines.

Explore CEMS application

Water and process utilities

Assess exposed instrument and sample lines for winter conditions. Identify the shutdown scenario, required flow and available power before choosing freeze protection.

Explore application

Food, pharmaceutical and OEM

Discuss temperature-sensitive transfer and analytical duties, including compatibility, cleanliness and connection requirements. Confirm any hygienic or application-specific requirements for the exact product.

Manufacturer application context: tubing bundles. The water, food and pharmaceutical examples require an application review; suitability is not implied by the industry name.

PMA colleague reviewing a steam-traced tubing sample

A useful specification starts with your process

Sending the operating conditions at the outset helps us review the correct tubing bundle and return a more useful quotation.

  • Fluid and purpose: composition, flow, pressure and whether the duty is freeze protection, temperature maintenance or analytical sampling.
  • Tubing: number of heated and unheated tubes, outside diameter, wall thickness and preferred material.
  • Temperature: required maintained temperature, normal and maximum inlet temperature, ambient extremes and any steam blowdown.
  • Utilities: electrical voltage and control requirements, or steam conditions and condensate arrangements.
  • Route: total length, bends, support method, installation environment and required end connections.
  • Documentation: area classification, certification requirements and any project-specific drawings or material records.

Plan installation and ongoing access

Protect the insulation

End seals, penetrations and any exposed sections need the correct treatment. Keep moisture out of the insulation and select compatible termination accessories for the bundle.

Complete the heating system

Review the electrical circuit, protection, temperature sensing and control together. For steam tracing, include supply conditions, drainage and condensate handling.

Verify before service

Follow the instructions for the supplied product and site procedures. Include appropriate tube-integrity, electrical and temperature checks, with access for future inspection.

A published example from power generation

Marmon’s 2026 case study describes high-temperature steam sample lines at a combined-cycle power plant. A buffered construction protected the electric heat trace from the hot process tubing while supporting the required sample-line duty.

The manufacturer reports 19% total installation cost savings in that project through a tailored bundle design, smaller outside diameters and reduced cable-tray requirements.

The lesson is to specify against actual operating conditions. These are manufacturer-reported results from one installation; the outcome for a new project depends on its design and site conditions.

Read the power-generation case study

PMA colleagues reviewing an application brief beside a treatment facility

Technical resources for your next step

Tubing range overview

Compare traced tubing, pre-insulated tubing, CEMS and heated-hose families in the manufacturer’s two-page line card.

View the line card

Dekatrace steam tracers

Review the separate 2DT1 and 2DT2 steam-tracer product sheet. These pipe and vessel tracers have their own specification.

View the product sheet

Buffered line design

Explore the published combined-cycle power-plant example and the value of matching the bundle to process exposure.

Read the case study

Project documents

Ask PMA for the datasheet, installation instructions, accessories and documentation relevant to your chosen construction.

Request documents

Your tubing questions, answered

What is electrically traced tubing?

It is a tubing assembly with an electric heater, thermal insulation and a protective jacket. The heater supplies heat to the process line for a specified freeze-protection or temperature-maintenance duty.

Does pre-insulated tubing prevent freezing on its own?

Insulation slows heat loss but does not generate heat. During a prolonged cold shutdown, an insulated line can still cool towards ambient temperature. Assess whether active heat tracing or another protection method is required.

Should I choose electric or steam tracing?

Base the choice on the temperature duty, available utilities, route and operating routine. Electric tracing needs an appropriate circuit and control arrangement; steam tracing also needs a suitable supply and condensate return.

Does a self-regulating heater need temperature control?

Self-regulation does not define the complete control strategy. The process temperature limits, heater selection and installation requirements determine the sensing and control arrangement. Specify these with PMA.

Can Dekoron Unitherm tubing be used for analyser sample lines?

The range includes process and CEMS sample-line constructions. Select the tube material, temperature duty, sample flow and auxiliary lines around the analyser and sample conditions; an unsuitable transport line can change the sample before measurement.

What do you need to quote a replacement bundle?

Send the original part number or label if available, together with the line length, tube details, heating type and operating conditions. Include photographs and connection details so we can review the required replacement and accessories.

Bring your tubing requirements to PMA

New project, replacement line or technical question: share the conditions and we’ll help you identify your next step.

Let’s talk about your application.

Speak to the PMA team about your instruments, reagents or service requirements. Tell us what you need, and we’ll help you find the right next step.

  • Advice for your application. Find the right instruments, sensors and chemical reagents for your process.
  • Practical service support. Discuss commissioning, calibration, maintenance or an instrument issue with our team.
  • Clear next steps. Ask a technical question or request a callback, with your site and measurements in mind.
  • An enquiry, not a mailing list. Your details are used to respond to you. You won’t be added to a marketing database.

Trusted by our clients

Prefer to speak with us?

Call 01484 843 708

You can also email [email protected].

Tell us how we can help

Share your requirements below. All fields are required.


Your enquiry goes directly to our team. Your details are used to respond to you, and you won’t be added to a marketing database. Read our privacy policy.